Contact

EN

NL

EN

繁體中文

 简体中文

You will be redirected to our Chinese website.

Contact
This site works better with javascript enabled.

SAVE TIME

You place   700  Serto fittings  a year, which   means   1400  mountings.  You   spend   an average of 3 minutes per   connection   on   assembling,   resulting in  a   total   of   70 hours of   installation time   per year .

With  the Sertotool  you can   reduce the   mounting time  of one fitting in to   30 seconds , so will be able to assemble   these   700   fittings   within 12 hours .  This results in  a total time   saving of   58 hours .

YOUR ADVANTAGE ?

  • A   considerable   saving of   €3,480   (based on   700   links and   hourly wage of   € 60   p /   hour)
  • A constant   quality   of   the   connection
  • The great   ease   of  mounting the   larger sizes

Related news
Aspro Teesing Industrial Systems

products-and-services

Aspro-Teesing Industrial Systems produces locally the first 115-4RE CNG compressor for ENN.

Read more

G-Range Clamp connectors save you up to 75% weight over an ANSI flange.

products-and-services

Anything goes". Destec G-Range clamp connector hubs can be manufactured from Carbon, Stainless, Alloy and Duplex Steels with compatible clamp and Seal ring materials.

Read more

First new Phill is installed.

products-and-services

Recently,Teesing and Van Dorp Installaties provide a nationwide ( The Netherlands) collaboration set for the sale and installation of filling systems for CNG, or compressed natural gas.

Read more

SERTO Matic fast mountingSERTO Tool for fast mounting of small Serto couplings

More information?

More information about the SertoTool and SertoMatic? 
Contact our specialists:

TEESING SALES ENGINEERS
NL: +31 70 413 07 00
CN: +86-(0)10-60576210
USA: +(1) 973 383 0691
TW: +886-(0)3-5600560
Mail  [email protected]